• Industry Sand Construction Delivery Time 2-4 Weeks
  • Industry Sand Construction Delivery Time 2-4 Weeks
  • Industry Sand Construction Delivery Time 2-4 Weeks
  • Industry Sand Construction Delivery Time 2-4 Weeks
  • Industry Sand Construction Delivery Time 2-4 Weeks
  • Industry Sand Construction Delivery Time 2-4 Weeks

Industry Sand Construction Delivery Time 2-4 Weeks

Application: Food, Chemical
Feature: Moisture Proof, Recyclable
Material: PP
Shape: Plastic Bags
Making Process: Plastic Packaging Bags
Raw Materials: Polypropylene Plastic Bag
Samples:
US$ 10/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (17)

Basic Info.

Model NO.
TH-Upanel8
Bag Variety
Upright Bag
Loading Weight
500-1500kg
Usage
Industry/Agriculture
Delivery Time
2-4 Weeks After Po Date
Bag Style
U-Panel
Transport Package
Pallet Packaging
Specification
110x110x120cm
Trademark
Taihong
Origin
China
HS Code
6305320000
Production Capacity
1200, 000pieces/Year

Product Description

Raw Material
100% virgin polypropylene materials
Color
white, beige or black
Regular Size
85x85x100cm / 90x90x120cm / 60x60x80cm or as your request
Safety Factors
3:1,5:1 and 6:1
Loading Capacity
500kg--3000kg
Construction
U-panel, Tubular or 4-panels
Fabric
100gsm--260gsm
Coating
uncoated, coated, breathable
Loops
cross corner loops/ Stevedore loops/ side-seam loops
Top
full open / duffle / top spout or as your request
Bottom
flat bottom / bottom spout / bottom skirt or as your request
Liner
form-fit liner / tubular liner/ AL liner/ VCI liner
Sewing
Plain / chain / overlock/ leakproof
Characteristica
Type A / Type B / Type C
Printing
As you request

Industry Sand Construction Delivery Time 2-4 Weeks

 

Taizhou Taihong New Packaging Materials Co., Ltd

 

Taizhou Taihong New Packaging Materials Co., Ltd is located in Taizhou City, Jiangsu Province, just 210 kilometers from Shanghai. With over 16 years of experience, our company specializes in producing a variety of Flexible Intermediate Bulk Containers (FIBCs) to meet diverse packaging needs.

 

Our state-of-the-art facility spans 26,000 square meters and houses advanced equipment such as extrusion machines, round weaving machines, sewing machines, and printing machines. We also have quality testing equipment including fabric tensile testers, belts tensile testers, top lift testers, metal detectors, and cleaning machines.

 

We offer a wide range of FIBCs, including anti-static bags, breathable bags, sift-proof bags, baffled bags, AL liner bags, and PE liner bags. Our annual production exceeds 2 million pieces, with sales surpassing 80 million yuan. We hold ISO 9001 and UN certifications, ensuring the highest quality standards.

 

Our products are distributed globally, with satisfied customers in the United States, Europe, Canada, Korea, Japan, and beyond. With a commitment to quality and service, we have earned a stellar reputation in the industry, garnering recognition from customers worldwide.



Industry Sand Construction Delivery Time 2-4 WeeksIndustry Sand Construction Delivery Time 2-4 Weeks

For Industry Sand Construction, our pallet packaging is standard (Size: L*W*H). Fast 2-4 week delivery available.

Industry Sand Construction Delivery Time 2-4 Weeks

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
97
Year of Establishment
2022-12-05